About

Attached to the laminar flow boxes in the fabrication lab. Ventilation into the fume hoods.

Documentation

(< 2023)

Connection between motor shaft and fan breaks frequently. Spetec has no permanent solution, but fixed it regularly.

----------------

(2023-02)

Finally, connection is replaced by a custom made connector from stainless steel. CAD model/drawing attached.

Spetec_Ventilation_Arm.dwgSpetec_Ventilation_Arm.ipt

----------------

(2023-03)

New stainless steel connector replaced in both ventialtion arms. 2K epoxy-glue is used to fix the connector to the motor shaft. The fan is just pressed on the connection piece.