This control VI does not contain any logic that provides operation set points for the CHP. The task of this control VI is:

  • Generate the S0 signal that corresponds to the desired power


Inputs:

  • On/off signal for the CHP: CHP on off
  • Electric set power of the CHP: elPowerCHP


Outputs:

  • Temperatures and flow rates as shown in CHP - Hardware [l/min] and [°C]
  • Electric and thermal power
  • Electric and thermal efficiency

Internal parameters of control:

  • Keine Stichwörter

Kommentar

  1. Anurag Mohapatra sagt:

    Wow, \LaTeX in Wiki!