This control VI does not contain any logic that provides operation set points for the CHP. The task of this control VI is:
- Generate the S0 signal that corresponds to the desired power
Inputs:
- On/off signal for the CHP: CHP on off
- Electric set power of the CHP: elPowerCHP
Outputs:
- Temperatures and flow rates as shown in CHP - Hardware [l/min] and [°C]
- Electric and thermal power
- Electric and thermal efficiency
Internal parameters of control:
- for CHP in house 1 can be found here: CHP - Parameters SF1
Kommentar
Anurag Mohapatra sagt:
06. Oktober 2022Wow, \LaTeX in Wiki!